Pressure Vessels
Heavy-wall reactors, separators, columns, and accumulators built to ASME Section VIII Division 1, with U stamping.
PT SK Metalindo designs and fabricates ASME-coded pressure vessels, storage tanks, heat exchangers, expansion joints, and gaskets for energy, petrochemical, and process industries across Southeast Asia and beyond.
Every product leaves our Cikarang facility with full material traceability, third-party witnessed testing, and documentation aligned to the client's jurisdictional code. No subcontracted welding. No compromise on WPS.
Heavy-wall reactors, separators, columns, and accumulators built to ASME Section VIII Division 1, with U stamping.
Field-erected atmospheric and low-pressure tanks for crude, refined products, water, and chemicals — API 650 and 620.
Shell-and-tube and double-pipe exchangers per ASME VIII and TEMA Class R, C, and B for refining, gas, and petrochemicals.
Metallic, fabric, and rubber expansion joints engineered to EJMA and ASME B31.3 for high-temperature ducts and process piping.
Hydrotest, PMI, and final inspections under third-party and client surveillance — Lloyd's, BV, ABS, SGS, TÜV.
RT, UT, PT, MT, and phased-array UT performed in-house by Level II/III certified inspectors.
Heat-number tracking from mill certificates through to as-built dossiers — every weld, every plate, every joint.
Two-stage steam scrubbers and atmospheric flash tanks, 4,500 mm Ø × 18,000 mm T/T, SS316L for chloride service.
Scrubber, atmospheric flash tank, and piping for Sumitomo / IKPT / Wasa Mitra consortium. ASCE 7-16 seismic, API-650 design.
Three-phase horizontal separator, 3,200 mm Ø × 12,000 mm T/L–T/L, SA-516 Gr.70 with 3 mm Alloy 625 weld overlay.
DN 2,800 universal tied joints for flue-gas ducting, Incoloy 800H bellows, 720°C operating.
API 650 external floating roof, 55 m Ø × 18 m height, 42,000 m³ ea.
ASME VIII Div. 1, SA-336 F22V with 25Cr-22Ni-2Mo overlay, NACE MR0175.
[REPLACE WITH REAL CLIENT QUOTE — strong line about delivery discipline, code adherence, and on-time hand-over for a large geothermal package.]
[REPLACE WITH REAL CLIENT QUOTE — quality of welding, NDE documentation, and inspection readiness for a refinery expansion project.]
[REPLACE WITH REAL CLIENT QUOTE — capability with exotic materials and tight schedule for an upstream separator package in Kalimantan.]
Live testimonials replace placeholders before launch.
Send drawings, P&IDs, or written specifications. Our engineering desk reviews every inquiry and returns a budget figure or technical clarification within 24 hours.
Submissions routed to the senior engineering desk.