06 / Boilers & Economizers

Steam boilers and economizers to ASME I.

Configurations06
Boiler furnace and steam drum — PT Unilever Indonesia 2023
HRSG — FerTEZ project Uzbekistan 2018
Overview · 01

ASME Section I power boilers, waste-heat boilers, and economizer assemblies for power generation, geothermal, and industrial steam service.

Datasheet · 06Rev. 01 · 2026
Code
ASME I (S stamp)
Steam capacity
up to 120 t/h
Design pressure
up to 100 barg
Design temperature
up to 540 °C
Fuels / heat source
Natural gas, oil, coal, biomass, waste-heat
Materials
SA-516 Gr.70, SA-210 A1, SA-213 T11/T22, SA-335 P11/P22
Configurations · 02

What we build.

Water-Tube Boilers

D-type and bi-drum water-tube boilers for high-pressure steam.

Fire-Tube Boilers

Packaged 2- and 3-pass fire-tube boilers for industrial steam.

HRSG

Heat-recovery steam generators on turbine and engine exhaust.

Economizer Banks

Finned-tube economizer modules for flue-gas heat recovery.

Superheaters

Primary and secondary superheater coils to SA-213 alloy tubing.

Steam Drums

ASME I steam drums with internals (cyclones, baffles, demister).

Materials & welding · 03

Materials

  • Drums and shells — SA-516 Gr.70 (post-weld heat treated)
  • Boiler tubes — SA-210 Gr.A1
  • Superheater alloy tubes — SA-213 T11 / T22
  • Headers and piping — SA-335 P11 / P22
  • Fins — carbon steel or 11Cr alloy for hot economizers

Welding & PWHT

  • Tube-to-tubesheet expansion + seal weld per ASME I PG-79
  • GTAW root + SMAW/SAW fill on header welds
  • Full PWHT for SA-335 P22 and heavy-wall drum welds
  • Documented WPS / PQR for every joint configuration
Testing & documentation · 04

Witnessed. Documented.

01

Hydrotest

Full hydrotest per ASME I PG-99 with chart recorder.

02

Tube expansion

Pull-out and torque verification on every tube-to-tubesheet joint.

03

Refractory inspection

Cured-in-place refractory mapped and signed off before close.

04

PWHT records

Time-temperature charts archived against each weld map.

Selected references · 05

Recent deliveries.

All projects
Inquiry · 06

Specifying a boilers & economizer? Start here.

Submissions routed directly to the senior engineering desk. Typical response under 24 hours.

Or download the datasheet template
Form · RFQ-06Rev. 01 · 2026